Work included the construction of 11,900′ siding with #20 turnouts on each end. In addition, work included construction of two bridges for the siding and all associated site work.
Project Category: Bridge
Main Track Upgrade
Lucas Siding Extension
Siding extensions of approximately 7,003′ included the construction of turnouts, roadbed, construction pads, access drives, new culverts, and removal of existing main line bridge and replacement with box culverts.