Project included the construction and all related site work to construct a 13,790′ bypass track, 1,938′ track shift, and 3,375′ track raise. Polivka International worked with EMH&T on the design-build of a retaining wall, culvert extension, and grade crossing on this project.
Project Category: Drainage
New Bohemia VA Siding Extension
Pavement Maintenance Program: Fairburn
Polivka International’s Pavement Maintenance Program provide a 3-5 year comprehensive plan to address pavement needs of terminals. Polivka provides a longterm solution for each terminal, not a short term fix.
New Third Main
Magnolia Universal Interlocking
Lucas Siding Extension
Siding extensions of approximately 7,003′ included the construction of turnouts, roadbed, construction pads, access drives, new culverts, and removal of existing main line bridge and replacement with box culverts.
Lorenzo Support Yard
I-220 Signal Mound Foundation
High Oak Yard Expansion
Project included construction of three separate tracks with a combined length of approximately 5,100′ at repair in place facility, and the construction of three tracks with a combined length of 17,500′ at the receiving and departure tracks. All work included associated site work required, including relocation of various utilities, storm drainage, and demolition.
Helme Siding Extension
Project included the installation of turnouts and a 5,700′ siding. Project included construction of roadbed and construction pads, all new track, access drives, new culverts, and all associated earthwork.