Project included the construction and all related site work to construct a 13,790′ bypass track, 1,938′ track shift, and 3,375′ track raise. Polivka International worked with EMH&T on the design-build of a retaining wall, culvert extension, and grade crossing on this project.
Project Category: New Track
Rankin Siding
New Third Main
New Automotive Terminal
Lucas Siding Extension
Siding extensions of approximately 7,003′ included the construction of turnouts, roadbed, construction pads, access drives, new culverts, and removal of existing main line bridge and replacement with box culverts.
Lead Track to Service Riviana Foods
Kilby Siding Setout & Inspection Yard
High Oak Yard Expansion
Project included construction of three separate tracks with a combined length of approximately 5,100′ at repair in place facility, and the construction of three tracks with a combined length of 17,500′ at the receiving and departure tracks. All work included associated site work required, including relocation of various utilities, storm drainage, and demolition.
Fairburn GA Intermodal Terminal Expansion
Corpus Christi Reconstruction
Connection CSX & Birmingham Southern
Cowan to Decherd Double Track Project
Project included 6 miles of double track and all associated site work, including extensive excavation. Polivka International worked with EMH&T on the design of a crash wall on this project.