Shelby Siding

Work included the construction of 11,900′ siding with #20 turnouts on each end. In addition, work included construction of two bridges for the siding and all associated site work.

Lucas Siding Extension

Siding extensions of approximately 7,003′ included the construction of turnouts, roadbed, construction pads, access drives, new culverts, and removal of existing main line bridge and replacement with box culverts.

Helme Siding Extension

Project included the installation of turnouts and a 5,700′ siding. Project included construction of roadbed and construction pads, all new track, access drives, new culverts, and all associated earthwork.