Smyrna Bypass Track

Project included the construction and all related site work to construct a 13,790′ bypass track, 1,938′ track shift, and 3,375′ track raise. Polivka International worked with EMH&T on the design-build of a retaining wall, culvert extension, and grade crossing on this project.

Lucas Siding Extension

Siding extensions of approximately 7,003′ included the construction of turnouts, roadbed, construction pads, access drives, new culverts, and removal of existing main line bridge and replacement with box culverts.

Helme Siding Extension

Project included the installation of turnouts and a 5,700′ siding. Project included construction of roadbed and construction pads, all new track, access drives, new culverts, and all associated earthwork.

Cowan to Decherd Double Track Project

Project included 6 miles of double track and all associated site work, including extensive excavation. Polivka International worked with EMH&T on the design of a crash wall on this project.